Professional Testing Center

It is the Mission of the Professional Testing Center at West Chester University to provide high quality educational testing and exceptional customer service, within a technologically appropriate facility. We are committed to providing students and working professionals both at West Chester University and the surrounding Mid-Atlantic region testing options to assist in their journey for academic and professional fulfillment. Our staff is trained to promote the overall goals of the testing center and to provide a positive and culturally respectful setting for testing candidates. The Professional Testing Center at West Chester University subscribes to all NCTA Standards and Guidelines for Post-Secondary Test Centers.

Contact InformationHours of Operation

Not sure which exam you need?

  • Certification exam for teaching in PA - Praxis & PECT
  • College credit by exam - CLEP
  • Grad school entrance exam - GRE
  • High school equivalency - GED
  • Proctoring for a course through another school - Test Proctoring
  • Professional/workforce certification (not listed above) - PearsonVUE Exams

Before You Come In — 3 Things to Know

  1. Bring a valid, government-issued photo ID (driver's license, passport, or state ID). No ID, no exam.
  2. Arrive 15 minutes early. More than 15 minutes late, and you'll need to reschedule.
  3. Phones, bags, and personal items go in a locker. Only your ID (and any exam-approved materials) come into the testing room with you.

Testing Center Location:
FHG Library, Suite 129 — 25 W. Rosedale Ave. Look for the purple "Professional Testing Center" sign, next to Starbucks.

Parking and Directions

Student taking a test

 

Quick FAQs

What exam am I here for?

What if I'm running late?

You have a 15-minute grace period. After that, your appointment may be forfeited and you'll need to reschedule.

What do I need to bring?

One valid government-issued photo ID. That's it, unless your specific exam requires something else (noted in your exam's section below).

How do I schedule an appointment?

For CLEP, Proctoring, and NCBAP: email PTC@wcupa.edu or call 610-436-2413. For Praxis, PECT, and GRE: register directly through ETS or Pearson (links in each section below).

Can I bring a family member or child with me?

No — only the person testing is allowed in the testing room, and staff can't supervise children. Please arrange childcare in advance.

Where do I park?

See Parking below — most nearby parking is paid, so plan a few extra minutes.

What if the university closes for weather?

See Weather Policy below.

Parking & Location

The Professional Testing Center is in Francis Harvey Green Library (FHG), Suite 129 — look for the purple Professional Testing Center sign.

  • Outside entrance: from the academic quad at the end of the library, near Recitation Hall or to the right of Starbucks.
  • Inside entrance: through the library, past Starbucks, follow the signs.

Parking is limited and mostly paid — arrive early. Arriving more than 15 minutes late forfeits your appointment.

Garages:

  • New Street Parking Garage (704 S. New Street)
  • Sharpless Street Parking Garage (5 Sharpless Street)
  • Student Recreation Center Parking Garage (275 North Campus Drive)
  • Commons Garage (124 North Campus Drive)

Metered street parking: South High Street, University Avenue, South New Street, South Church Street

Accessible parking: next to the Testing Center, north of W. Rosedale Ave. between S. High St. and S. Church St.

Parking Map (pdf)

Available On-Campus Testing

Taking a Praxis or PECT exam? Start here

PA Teacher Certification Exams

Aspiring Pennsylvania educators can take required certification exams at our testing center.  We offer both Praxis exams (ETS) and Pennsylvania Educator Certification Tests / PECT exams (Pearson).

To determine which test you need, see "Test Requirements by Major" below.

Accommodations

Test Requirements by Major

When registering for exams, make sure to report scores to the University.

For Pearson exams (PECT), select West Chester University of Pennsylvania as the recipient.
For Praxis exams, use the code 2659.

To report scores to Pennsylvania Department of Education (PDE), use the code 8033.

Please be aware that you must include your SSN, or your certification can be delayed.

Early Grades (PK-4)

PECT CBT: Module (PA702 OR PA006, 007, 008)

Middle Grades (4-8)

English Language Arts
  • Praxis II CBT: Grades 4-8 Core (5152 OR 5153, 5154, 5155)
  • Praxis II Subject Concentration: Grades 4-8 English Language (5156)
Social Studies
  • Praxis II CBT: Grades 4-8 Core (5152 OR 5153, 5154, 5155)
  • Praxis II Subject Concentration: Grades 4-8 Social Studies (5157)
Mathematics
  • Praxis II CBT: Grades 4-8 Core (5152 OR 5153, 5154, 5155)
  • Praxis II Subject Concentration: Grades 4-8 Mathematics (5158)
Science
  • Praxis II CBT: Grades 4-8 Core (5152 OR 5153, 5154, 5155)
  • Praxis II Subject Concentration: Grades 4-8 Science (5159)

Secondary (7-12)

Biology
  • Praxis II: Biology (5236)
Chemistry
  • Praxis II: Chemistry (5246)
Earth & Space Science
  • Praxis II: Earth and Space Sciences (5572)
English
  • Praxis II: English Language Arts Content Knowledge (5038)
General Science
  • Praxis II: General Science (5436)
Social Studies (history, geography, political science)
  • Praxis II: Social Studies (5581)
Mathematics
  • Praxis II: Mathematics (5165)
Physics
  • Praxis II: Physics (5266)

World Languages (PK-12)

French
  • Praxis II: Fundamental Subjects Content Knowledge (5511)
  • ACTFL/LTI: OPI and WPT French
German
  • Praxis II: Fundamental Subjects Content Knowledge (5511)
  • ACTFL/LTI: OPI and WPT German
Russian
  • Praxis II: Fundamental Subjects Content Knowledge (5511)
  • ACTFL/LTI: OPI and WPT Russian
Spanish
  • Praxis II: Fundamental Subjects Content Knowledge (5511)
  • ACTFL/LTI: OPI and WPT Spanish

“Specials”

Health & Physical Education
  • Praxis II: Fundamental Subjects Content Knowledge (5511)
  • Praxis II: Health and Physical Education Content Knowledge (5857)
Music
  • Praxis II: Fundamental Subjects Content Knowledge (5511)
  • Praxis II: Music Content Knowledge (5113)

Counselor Education PK-12

Praxis II: School Counselor (5422)

Literacy

Praxis II: Reading Specialist (5302)

School Speech & Language Pathology PK-12

Praxis II: Speech Language Pathology (5331)

Special Education

Praxis II: Fundamental Subjects Content Knowledge (5511) – Stand-Alone EDA Majors Only
Praxis II: Special Education Foundational Knowledge (5355) – All Special Education Majors

Principalship

School Leadership Licensure Assessment/SLLA (6990)

Prep Materials

GPA Sliding Scale & Instructional Add-Ons

Certification Test and Score Requirements (PA Sliding Scale)

The Pennsylvania Department of Education (PDE) allows teacher candidates applying for PA Teacher Certification to use a sliding scale, which combines GPA and test scores to determine eligibility.

To view the sliding scale, visit the Pennsylvania Department of Education’s Certification Testing Requirements page, click "Certification Test and Score Requirements" (Excel file on the right), and select Option #2. 

How It Works
  • Your final, cumulative GPA at graduation determines your qualifying range.
  • On the scale, locate your GPA along the top row and your test in the right column; their intersection shows the required score.
  • Scores at or above that value qualify.
  • GPA cannot be rounded (e.g., a 3.744 must use the 3.74 column).

Important Notes 
  • Applies only to Pennsylvania certification.
  • The sliding scale may also be used for add-on certifications.
  • No extra steps are needed! Staff will verify GPA and test scores during TIMS certification.
  • If your GPA doesn't meet the scale requirements, you must retake the exam(s).

Adding Content Area

  • Candidates already holding Instructional I certification may add additional content areas by passing the required subject test(s). View eligible add-ons and directions for applying in TIMS here.
  • For PDE details and TIMS applications, visit the PDE Instructional Add-Ons page.

Fee Waivers and Free Retest Policy

If paying for a certification exam is a financial hardship, or if you need to retake a test, there may be support options available for both Praxis and PECT.

Praxis Fee Waiver

Praxis fee waivers are available for eligible students with financial need. If approved, the waiver may cover up to three Praxis Core tests or one Praxis Subject Test.

To apply:

  • Complete the Praxis Fee Waiver Request Form before registering for the test.
  • Submit current financial aid documents, including an Enrollment Verification Certificate and the FAFSA Submission Summary if required.
  • Email all documents together to PraxisFeeWaiver@ets.org.
  • Watch your email, including spam/junk folders, for ETS instructions.
Praxis Free After 3

In this program, candidates who take the same Praxis test three times may qualify for free retakes of that same test for up to five years.

More information located here: Praxis Free After 3

PECT Fee Waiver

PECT also offers fee waivers for eligible students with financial need.

To apply:

  • Complete the PECT Fee Waiver Request Form before registering for the test.
  • Have the financial aid representative section completed if required.
  • Submit the form by email to estestvoucher@pearson.com or mail it to the address listed on the form. 
  • You should hear back within three weeks.
PECT Free Retest Policy

PECT offers a free retest option for eligible students who meet specific academic and score requirements.

To qualify, students must:

  • Have a GPA of 3.0 or higher
  • Have taken the test NO MORE than twice
  • Meet the required score range for the specific PECT exam

Current score ranges for the free retest option are:

  • PreK-4 Module 1: 184-196
  • PreK-4 Modules 2 and 3: 184-192
  • Special Education PreK-8 and Special Education 7-12: 209-219
  • PAPA Modules 1 and 3: 209-219
  • PAPA Module 2: 177-192

If you think you may qualify, send your unofficial transcript and score report(s) to PTC@wcupa.edu. The form must be submitted on your behalf.

Study Materials for Praxis and PECT

Recommended Study Resources:

CLEP

Earn college credit and skip prerequisites by completing multiple-choice CLEP exams in a 90- or 120-minute session. Results print immediately after testing. Scratch paper and pencils are provided. A three-month waiting period applies before retaking the same test title.


WCU CLEP Equivalencies

Review required passing scores and credit allocations (as of Spring 2023): CLEP Scores and Equivalencies (PDF)


Free Test Prep - ModernStates.org
  • ModernStates.org offers free CLEP prep courses through a College Board partnership. Create a free account, complete a prep course, then request a CLEP voucher to cover your exam fee.
Military Benefits (DANTES)
  • Eligible military members, spouses, and civil service employees may have CLEP exam and administration fees fully funded. Learn more at College Board - Military Benefits. 
Test Administration

Each CLEP exam has two fees:

Scheduling

Call or email to schedule — see 'How do I schedule' above.

Graduate School Entrance (GRE) Exams

GRE Dates 2026
May 22, 2026, 9:00 AM and 1:00 PM
July 9, 2026, 9:00 AM and 1:00 PM
August 10, 2026, 9:00 AM and 1:00 PM
August 24, 2026, 9:00 AM and 1:00 PM
September 11, 2026, 9:00 AM and 1:00 PM

Learn about the GRE General and GRE Subject Tests

High School Equivalency (GED)

A high school equivalency exam is a recognized alternative to a high school diploma. 

Our test center administers the General Educational Development (GED). Once the exam is complete, the diploma equivalent is nationally recognized.

Need proctoring for an exam from another school?

West Chester University’s Professional Testing Center provides proctoring for students and community members taking online courses through other institutions who need a local test site. Testing is available weekdays only. All fees are non-refundable.

Arrangements with Your School

Students must notify their instructor of their scheduled test date and confirm that WCU's Testing Center received the exam, instructions, and restrictions at least one business day before the appointment.

If exam materials must be mailed back and no prepaid return envelope is provided by the school, bring your own pre-addressed, prepaid envelope to your appointment.

Proctor Consent Forms 
  • If your school requires a consent form, use the following proctor information: 
    •  Contact: Brenna Kiley 
    •  Location: Francis H. Green Library, Suite 129 
    •  Address: 25 West Rosedale Avenue, West Chester, PA 19383 
    •  Email: PTC@wcupa.edu
    •  Office Phone: 610-436-2413 
 Proctoring Fee 

Payable to West Chester University of PA (non-refundable)

  • $45 for a 2-hour block
  • $10 per additional hour or for multiple exams

Pay Test Administration Fee

Scheduling

Call or email to schedule — see 'How do I schedule' above.

PearsonVUE Exams (NCBAP and Others)

The Testing Center also proctors a range of professional certification and licensure exams administered through PearsonVUE. Search PearsonVUE for your specific exam to confirm it's offered here.

Professional Certification and Licensure Exams

PearsonVUE

NCBAP (Certified Anticoagulation Care Provider Exam)

Demonstrate your expertise in anticoagulation management by earning your Certified Anticoagulation Care Provider (CACP) credential through the National Certification Board of Anticoagulation Providers (NCBAP). The computer-based exam is securely proctored, and scratch paper and pencils are provided. Official results are sent directly to you and the NCBAP.

If you plan to retake the exam, review NCBAP's retake policy for waiting periods and eligibility.

Exam Information

Learn about eligibility requirements, content, and passing scores on the NCBAP website. The site also provides the candidate handbook and recommended study materials.

Fees
Scheduling

Call or email to schedule — see 'How do I schedule' above.


Key Rules

  • Arrive on time — more than 15 minutes late means rescheduling with the testing company.
  • Bring valid photo ID.
  • Store phones and personal items in a locker before entering.
  • Only exam candidates are allowed in the testing room — please arrange childcare in advance.
     

See all testing room policies

  • Food and beverages are not allowed in the testing room.
  • Talking is not permitted in the testing room.
  • Leave all notes and testing materials in the room when you finish.
  • Calculators are allowed for certain exams; personal calculators will be inspected before use.
  • Open-book or open-note testing is only permitted for authorized exams.
  • Once your exam has started, it must be completed in one sitting.
  • Weapons are strictly prohibited.
  • Testing sessions may be videotaped or audio recorded.
  • Dishonesty during testing will be reported and may result in disciplinary action.
  • Strong scents (smoke, perfume, cologne) that could disrupt other test-takers may result in a request to reschedule.
  • Some testing programs have additional rules beyond these — check your specific exam's requirements.
exterior of the testing center

Weather Policy

The Testing Center follows West Chester University’s Closings and Cancellation Procedures.

  • If the University is closed, the Professional Testing Center is also closed.
  • If there is a delayed opening (e.g., a 10:00 AM start), exams scheduled before that time will be canceled and rescheduled.
  • In the event of a closure or delay:
    • Testing company examinees will be contacted directly to reschedule.
    • CLEP and Proctored Testing examinees must email PTC@wcupa.edu to arrange a new appointment.